Welcome to RPL

Completed Projects




 

DETAILS OF MAJOR MINING JOB EXECUTED

ANNEXURE-I

Sl

No.

Brief description of the work

Organization for which job was executed

Quantity executed

Value

(Rs. In Lacs)

Period

1

Excavation of approved soil from the Borrow Pits and transportation of same to LAKYA DAM site for raising of LAKYA DAM of Kudremukh Iron Ore Co. Limited (A government of India enterprises)

Jai Prakash Industries Kudremukh Iron Ore Co. Limited

Earth handled

31,64,200 CuM

1000.00

Jan-92

To

June-1993

2

Removal of Earth/spoil & Overburden by deployment of Heavy Earth Moving machinery at Bermo Coal Mines.

 

Damodar Valley Corporation A Govt. of India Enterprises

 

3199779 CuM

1419.36

Oct-93

To

Oct-95

3

Mining and Transportation of Silica Land

Ajanta Minerals, Faridabad

12558000

CuM

4307.18

Aug-93

To

Mar-2000

4

Handling and removal of Mill Scale and sludge from compartment of Bokaro Steel Plant

 

SAIL, Bokaro Steel Plant

A govt. of India Enterprises

1162000

CuM

511.00

Feb-94

To

June-96

5

Diversion of Gobardha Nallah (Phase II) at Bina Project

Northern Coalfields Ltd., Bina Project

800000

CuM

520.00

Apr-95

To

Dec-95

           

6

Construction of feeder channel from KM 28,000 to KM 34,000 at Bansagar

 

Bansagar Canal Construction, Circle, Mirzapur, U.P.

1663000 CuM

1824.00

May-98

To

Jun-2000

7

Running silica mine at Pali, Faridabad Haryana producing Silica sand at the rate of 7000 TPD (Annual capacity 2.2. million tonnes) from 1993 onwards by deployment of Heavy Earth Moving Machinery

Rungta Projects Limited

22 lac tonnes per year

 

1993-1998

8

Excavation, Loading, Transporting of Shell Material from Borrow area to Dam for Fill Placement (Av Lead 5 KM)

Excavation, transportation, processing & preparing of Stock Piles for Clay Core material including compaction and disposal of excavated material at Spillway (Av Lead 2 KM)

Jai Prakash Industries for constriction of Tehri Dam Project

Under Tehri Hydro development corporation Limited. (A joint venture of Government of India and Government of U.P.)

7378000 CuM

6288.00

 

Nov-98

To

Apr-03

           

9

Removal of Overburden and raising of Limestone by deploying HEMM and transportation of Limestone From Sarle Mine to Factory premises

Lemos Cements Ltd.,Khalari

OB:

844500 Cum

Limestone

947000

2248.69

Apr-98

To

Sep-01

10

Hiring of HEMM to be deployed at DVC Bermo Mines for removal of stones, Old Debris & Earth

Damodar Valley Corporation, A Government of India Enterprises

2398402 CuM

1682.60

Aug-02

To

Jul-05

11

Scientific exploitation of Laikdih Ramnagore seam of Ramnagore colliery Open Cast Mining Operation

 

The Indian Iron & Steel Company Ltd. Burnpur

 

906.23

Jul-03

To

Dec-04

12

Scientific exploitation of Laikdih/ Ramnagore Seam of Ramnagore Colliery Open Cast Mining Operation

IISCO, Ramnagore Colliery

OB: 2692683 CuM

Coal

559630.34 te

3335.63

Feb-05

To

Feb-08

13

Scientific exploitation of Laikdih/ Ramnagore Seam of Ramnagore Colliery Open Cast Mining Operation

IISCO, Ramnagore Colliery

OB:

2964109

Coal

536582 Te

2947.67

Mar-08

To

Mar-11

           

14

Scientific exploitation of Salanpur ‘C’ Seam of Ramnagore Colliery

IISCO, Ramnagore Colliery

OB:

679404 Cum

Coal:

144738 Te

668.66

Feb-09

To

May-10

15

Scientific exploitation of Salanpur ‘C’ Seam of Ramnagore Colliery

IISCO, Ramnagore Colliery

OB:

1311989 Cum

Coal:

205820 Te

1388.03

Dec-10

To

Jun-12

Work Continuing

16

Blast Hole Drilling, Blasting, Excavation of various Rocks/Soil-Earth Cutting, Loading, Transport, Dumping, Dozing, levelling at Dump site by using HEMM

Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

OB:

8122217 CuM

4559.70

 10.01.05

to

04.07.06

17

Blast Hole Drilling, Blasting, Excavation of various Rocks/Soil-Earth Cutting  Loading, Transport, Dumping, Dozing, levelling at Dump site by using HEMM

Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

OB: 17587212 CuM

8341.94

Jun-07

To

Jan-11

           

18

Blast Hole Drilling, Blasting, Excavation of various Rocks/Soil-Earth Cutting Loading, Transport, Dumping, Dozing, levelling at Dump site by using HEMM

Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

OB:

11892961 CuM

6595.59

11-02-11

To

02-02-13

Work Continuing

19

Blast Hole Drilling, Blasting, Excavation of various Rocks/Soil-Earth Cutting Loading, Transport, Dumping, Dozing, levelling at Dump site by using HEMM

Central Coalfields Limited, Piparwar  Open Cast Project, Piparwar Area.

OB:

2130498 Cum

1378.43

23-11-06

To

22-08-07

20

Blast Hole Drilling, Blasting, Excavation of various Rocks/Soil-Earth Cutting Loading, Transport, Dumping, Dozing, levelling at Dump site by using HEMM

Central Coalfields Limited, Piparwar  Open Cast Project, Piparwar Area.

OB:

3357269 CuM

1593.34

29-09-07

To

28-09-09

21

Extraction of Coal/Coal Measure Strata at Ashoka OC by Deployment of Surface Miner & Transportation of Coal to RCM / Bachra Siding.            Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

Coal:

6233194.88 Te

4153.25

08-04-04

To

17-11-06

           

22

Extraction and transfer of coal into tippers by deploying Surface Miners, payloaders and other allied equipment and transportation of coal by contractor’s tipping trucks to RCM/Bachra Siding

Central Coalfields Limited, Ashoka Open Cast Project, Piparwar Area.

Coal

4499982 Te

3225.68

18-11-06

To

09-08-09

 

23

Extraction and transfer of coal into tippers by deploying Surface Miners, payloaders and other allied equipment and transportation of coal by contractor’s tipping trucks to RCM/Bachra Siding

Ashok OCP

of

Central Coalfields Limited

Coal

4179972 Te

3721.54

08-09-09

To

30-11-12

24

Extraction and transfer of coal into tippers by deploying Surface Miners, payloaders and other allied equipment and transportation of coal by contractor’s tipping trucks to KDH  Siding

 

Ashok OCP

of

Central Coalfields Limited

Coal

1117044  Te

991.51

22-11-06

To

21-11-09

 

25

Extraction and transfer of coal into tippers by deploying Surface Miners, payloaders and other allied equipment and transportation of coal by contractor’s tipping trucks to KDH  Siding

Piparwar OCP

Of

Central Coalfields Ltd.

Coal:

7225751 Te

6617.22

30-12-09

To

15-09-12

 

           

26

Removal of overburden and production of coal including drilling, transportation of OB to dump site and transportation of coal to Railway Siding at Tikak and Tirap Opencast Projects of North Eastern Coalfields, Margherita

 

Work Order  No.NEC/GM/08/09/109/110 /111 & 112 all dated 18.08.2008

North Eastern Coalfields,

Coal India Ltd.,

Margherita

Hard Shale:

15386631 CuM

 

Coal

2176205 CuM

14,626.80

11-07-08

To

10-07-11

29

Removal of overburden and production of coal including drilling, transportation of OB to dump site and transportation of coal to Railway Siding at Tikak and Tirap Opencast Projects of North Eastern Coalfields, Margherita

Work Order  Work Order No.NEC/GM/Tikak(E)/12/01 dated 03.01.12 & NEC/GM/Tirap(E)/12/09 dated 27-01-12

North Eastern Coalfields,

Coal India Ltd.,

Margherita

Hard Shale:

1059371.33CuM

 

Coal

117546.92 CuM

1155.66

25-11-11

To

31-03-12

 

Work Continuing