Welcome to RPL


Rungta Projects Limited (RPL)


It is the Flagship Company of RUNGTA GROUP OF COMPANIES. It was established in the year 1983 mainly for Mining & Transportation of minerals. The Group started with a vision of contributing to make a vibrant and resilient National Economy. Starting with its core competency in Mining, it has a diversified portfolio of Mining, Transporting, Construction, Real Estate, Cement Production, Steel Making, Coal Handling and Logistics, etc. and has established a country-wide presence. Over the years it has acquired expertise in Open Cast Mining Operations involving large scale Earthwork, Stone work and Mineral extraction. It has built up a large reservoir of Managers, Engineers, Operators and workers specialized in mining. It has a large fleet of Heavy Earthmoving machinery-one of the largest with any company in the Eastern Region of the Country. The group operates in Jharkhand, Orissa, Uttar Pradesh, Maharashtra, West Bengal and North Eastern States.

Our Profile


RUNGTA PROJECTS LIMITED (RPL) has had the privilege of working with big organizations like Coal India and its Subsidiaries, SAIL, DVC and various State Governments.

Having established an impressive position in the area of Coal Mining and Transportation & Bulk Material Handling,   RPL has diversified its business operations into Coal handling & Rake management. RPL undertakes the entire activities connected with rail dispatch of coal traffic starting from lifting of coal from the collieries of Central Coalfields Ltd., transporting, sizing and loading into railway wagons on behalf of the Clients. RPL possesses sufficient infrastructure and resources for dispatch of coal by rail and road mode. 

The Group has its own dedicated railway siding situated at Khalari, Jharkhand in operation within the close proximity of CCL’s mines. The Railway Siding is capable of loading at least Two full rakes daily. It has its own diesel shunting locomotives for placement of rakes to its railway siding. It has large fleet of Tippers & pay loaders. 

RPL, in a very short span, has gained goodwill and high appreciation of its major clients of Core sectors for efficient services.

M/s RPL believes in the maxim that “a safe operation is always the most efficient operation”. It has designed its safety policy with this maxim in mind. Apart from the statutory training that is imparted to the operation and maintenance personnel, the company organizes safety workshops for its workers, supervisors, and managers at frequent intervals. The result has been an excellent safety record during the entire period of during which the company has been involved in mining operations.

RPL has rich Coal Mining experience by Open Cast Mining method. The work executed per annum is in the range of:

Coal production                                          :  5 Million tonne 

Overburden removal                                   : 15 Million CuM 

Loading & transportation                           : 40 Million tonne